DECOMMISSION
Plan shutdown, protection, removal and equipment handling.
A commercial rooftop solar project showing how Grid Titans approaches existing PV decommissioning, roof coordination and modern system reconstruction as a single, disciplined construction process.
DISCUSS A PROJECT ↗
When commercial roofs need major work, the photovoltaic system becomes part of the construction schedule. The array must be safely disconnected, equipment removed and handled, and the roof and electrical installation coordinated before solar production can be restored.
At Marin Builders Association, Grid Titans' repowering scope involved decommissioning the existing solar installation and rebuilding a modern rooftop system following roof work. The as-built revision documents a 48-module Hyundai Energy Solutions array totaling 21.12 kW DC, with Enphase IQ8P three-phase microinverters.
Plan shutdown, protection, removal and equipment handling.
Align PV removal and reinstallation with roofing and access requirements.
48-module, 21.12 kW DC photovoltaic design.
Electrical inspection, system testing and return-to-service coordination.
The commercial repowering sequence, documented on site: removing the original solar array, lifting new modules to the roof by crane and reconstructing the PV installation.
The original commercial solar installation, documented before Grid Titans removed the panels for the roofing and solar reconstruction sequence.

The original PV installation before decommissioning

Existing panel layout and roof conditions before removal

The Marin Builders rooftop after removal of its previous solar panels, showing the field conditions and roofing coordination involved in repowering.
.jpg)
A crane delivers new photovoltaic modules to the commercial roof one of the key logistical steps between decommissioning and array reconstruction.

The reconstructed commercial photovoltaic system an updated electrical installation designed to serve the building beyond its roofing improvements.
A real example of the growing commercial solar repowering market where safe decommissioning, electrical infrastructure, equipment selection, new rooftop attachments and coordinated scheduling matter as much as the modules themselves.
DOCUMENTED WORK: Original array decommissioning, roofing coordination, module delivery by crane and commercial PV system reconstruction.
Discuss your commercial solar, storage, repowering or microgrid project with our team.