DISTRIBUTION MODERNIZATION
Panels, feeders, subpanels and infrastructure improvements serving a multi-building campus.
A multi-phase electrical modernization and energy-storage integration program for a remote retreat campus with future-focused distribution, renewable generation and advanced battery systems.
DISCUSS A PROJECT ↗
Expanding a campus electrical system is rarely as simple as adding equipment. The Odiyan project spans utility distribution, feeders and panels, renewable generation, energy storage and the coordination required to bring distinct electrical systems together while maintaining practical campus operations.
Permitted plans identify a 108 kW DC commercial solar array alongside battery energy storage and microgrid controls. Grid Titans' electrical scope includes distribution upgrades, equipment integration and coordinated protection across the campus.
Panels, feeders, subpanels and infrastructure improvements serving a multi-building campus.
180-module, 108 kW DC PV design recorded in permit plans.
Commercial energy storage cabinets and power-conversion system integration.
Coordinated protection, distribution, communications and utility interconnection.
The work creates a more capable electrical foundation for the Odiyan campus, bringing power distribution, renewable generation, storage equipment and coordinated controls together as one infrastructure program.
PROJECT SCOPE: Multi-phase electrical modernization, solar PV, commercial storage and microgrid integration.
Discuss your commercial solar, storage, repowering or microgrid project with our team.